Sunday, September 30, 2007
Buoyancy tank with compensator holding bracket/cage to be placed on 42inch pipeline at 182 FSW. ( feet of seawater) .
The Saturation diver will install this on the submerged p/l so the barge can bring this p/l back to surface for repairs. This isn't done very often. Once the p/l is lay ed at this depth it's seldom picked back up.
Monday, September 17, 2007
Burning at the waterline

I want to congratulate all the crew on this job, there was not a single complaint from being there, aka bitching.
Subscribe to:
Posts (Atom)